The Southern Bridge () is an extradosed bridge built across the Daugava River in Riga, the capital of Latvia. The bridge was constructed between 2004 and 2008, and was opened on November 17, 2008. Construction of the access roads lasted until 2013.
Because of the bridge's huge cost it also become colloquially known as The Golden Bridge ( Zelta tilts).
In 2009 The Economy Police launched a criminal case on suspected violations in construction of the bridge. State Audit Office concluded that the Riga City Council had squandered 27 million lats in the construction. In 2013 the students of Stockholm School of Economics in Riga calculated that the same bridge could've been built for a budget two times smaller.
|
|